THE BEGINNING OF RELIABILITY CENTERED MAINTENANCE IMPLEMENTATION (RCM) AT COAL FIRED STEAM GENERATION POWER PLANT (PLTU) LABUAN Case study of Stacker Reclaimer Type DQL 1250/D204

Labuan Coal fired Steam Generation Power Plant is the first power plant was build in Indonesia as Government Program in Plant Energy Diversification Acceleration Program 10000 MW which have 2 power station China manufacturer with capacity 2 x 300 MW . It power plant has been operating in one year an...

Full description

Saved in:
Bibliographic Details
Main Author: SATRIYO (NIM : 23108310); Pembimbing: Prof. DR. Ir. H. Indra Nurhadi, BUDI
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/15195
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia