THE BEGINNING OF RELIABILITY CENTERED MAINTENANCE IMPLEMENTATION (RCM) AT COAL FIRED STEAM GENERATION POWER PLANT (PLTU) LABUAN Case study of Stacker Reclaimer Type DQL 1250/D204
Labuan Coal fired Steam Generation Power Plant is the first power plant was build in Indonesia as Government Program in Plant Energy Diversification Acceleration Program 10000 MW which have 2 power station China manufacturer with capacity 2 x 300 MW . It power plant has been operating in one year an...
Saved in:
Main Author: | SATRIYO (NIM : 23108310); Pembimbing: Prof. DR. Ir. H. Indra Nurhadi, BUDI |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/15195 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Analisis fleksibilitas sistem perpipaan pada PLTU Labuan 300 MW dengan program Caesar II
by: , ASTUTI, Yusri Heni Nurwidi, et al.
Published: (2008) -
Automated battery plate stacker
by: Fadrigon, Clarisa, et al.
Published: (1998) -
STUDY OF IMPLEMENTATION OF RELIABILITY CENTERED MAINTENANCE (RCM) IN PLTU SURALAYA A STUDY CASE OF PULVERIZER, MPS-89N TYPE, 5-7 UNITS
by: (NIM : NIM : 23108327); Pembimbing : Prof. Dr. Ir. H. Indra Nurhadi, ZULFADHLI -
Computer controlled pneumatic canned tuna stacker
by: Alvarez, Francis T., et al.
Published: (1998) -
Pressure effects on steam pyrolysis of coal
by: Abichandani, J.S., et al.
Published: (2014)