THE BEGINNING OF RELIABILITY CENTERED MAINTENANCE IMPLEMENTATION (RCM) AT COAL FIRED STEAM GENERATION POWER PLANT (PLTU) LABUAN Case study of Stacker Reclaimer Type DQL 1250/D204
Labuan Coal fired Steam Generation Power Plant is the first power plant was build in Indonesia as Government Program in Plant Energy Diversification Acceleration Program 10000 MW which have 2 power station China manufacturer with capacity 2 x 300 MW . It power plant has been operating in one year an...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/15195 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!