To expand its production, Unit Bisnis Pertambangan Emas (UPBE) Pongkor (PT. XYZ) had planned to develop a mine at Ciguha area at level 400/450. The development of Mining Production at this level will be started by the construction of inclined shaft build down to level 400/450.<p> <br />...

Full description

Saved in:
Bibliographic Details
Main Author: DANTON PANDAPOTAN SILALAHI (NIM 121 02 021); Pembimbing : Prof. Dr. Ir. Rudy Sayoga Gautama , DIMORIS
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/15406
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:15406
spelling id-itb.:154062017-09-27T10:39:04Z#TITLE_ALTERNATIVE# DANTON PANDAPOTAN SILALAHI (NIM 121 02 021); Pembimbing : Prof. Dr. Ir. Rudy Sayoga Gautama , DIMORIS Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/15406 To expand its production, Unit Bisnis Pertambangan Emas (UPBE) Pongkor (PT. XYZ) had planned to develop a mine at Ciguha area at level 400/450. The development of Mining Production at this level will be started by the construction of inclined shaft build down to level 400/450.<p> <br /> <br /> <br /> During the development of inclined shaft, groundwater inflow will become the most problem issue. When the development is continued beneath, it is afraid that the groundwater's appearance will be larger that will disturb the development activities. Then, a hydrogeology investigation is needed to determine hydrogeology condition surrounding inclined shaft location, so the recommendation of the best-to-handle the groundwater inflow and drainage system can be given. Field investigations are carried out to asses the variability of a borehole (110 meter length) as it intersects various hydrogeological units.<p> <br /> <br /> <br /> Based on the analysis of hydrogeological and geological condition, the groundwater appearance is controlled by fractured aquifer and considered to be the main passage for groundwater flow. The excavation method that is recommended is shaft sinking conventional by 3 meter length of excavation section in development the inclined shaft, so that the maximum rate of groundwater inflow to the tunnel is 4.11 m3/jam. And the drainage system will require of minimum 2 pump is plugged; with 2 L/sec pumping capacity, with one-hour off. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description To expand its production, Unit Bisnis Pertambangan Emas (UPBE) Pongkor (PT. XYZ) had planned to develop a mine at Ciguha area at level 400/450. The development of Mining Production at this level will be started by the construction of inclined shaft build down to level 400/450.<p> <br /> <br /> <br /> During the development of inclined shaft, groundwater inflow will become the most problem issue. When the development is continued beneath, it is afraid that the groundwater's appearance will be larger that will disturb the development activities. Then, a hydrogeology investigation is needed to determine hydrogeology condition surrounding inclined shaft location, so the recommendation of the best-to-handle the groundwater inflow and drainage system can be given. Field investigations are carried out to asses the variability of a borehole (110 meter length) as it intersects various hydrogeological units.<p> <br /> <br /> <br /> Based on the analysis of hydrogeological and geological condition, the groundwater appearance is controlled by fractured aquifer and considered to be the main passage for groundwater flow. The excavation method that is recommended is shaft sinking conventional by 3 meter length of excavation section in development the inclined shaft, so that the maximum rate of groundwater inflow to the tunnel is 4.11 m3/jam. And the drainage system will require of minimum 2 pump is plugged; with 2 L/sec pumping capacity, with one-hour off.
format Final Project
author DANTON PANDAPOTAN SILALAHI (NIM 121 02 021); Pembimbing : Prof. Dr. Ir. Rudy Sayoga Gautama , DIMORIS
spellingShingle DANTON PANDAPOTAN SILALAHI (NIM 121 02 021); Pembimbing : Prof. Dr. Ir. Rudy Sayoga Gautama , DIMORIS
#TITLE_ALTERNATIVE#
author_facet DANTON PANDAPOTAN SILALAHI (NIM 121 02 021); Pembimbing : Prof. Dr. Ir. Rudy Sayoga Gautama , DIMORIS
author_sort DANTON PANDAPOTAN SILALAHI (NIM 121 02 021); Pembimbing : Prof. Dr. Ir. Rudy Sayoga Gautama , DIMORIS
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#