#TITLE_ALTERNATIVE#
To expand its production, Unit Bisnis Pertambangan Emas (UPBE) Pongkor (PT. XYZ) had planned to develop a mine at Ciguha area at level 400/450. The development of Mining Production at this level will be started by the construction of inclined shaft build down to level 400/450.<p> <br />...
Saved in:
Main Author: | DANTON PANDAPOTAN SILALAHI (NIM 121 02 021); Pembimbing : Prof. Dr. Ir. Rudy Sayoga Gautama , DIMORIS |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/15406 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: (NIM 22100029); Pembimbing: Dr.Ir. Sudarto Notosiswoyo dan Dr.Ir. Rudy Sayoga Gautama, MARYATIN -
#TITLE_ALTERNATIVE#
by: (NIM 120 02 021), Casdira -
#TITLE_ALTERNATIVE#
by: (NIM 170 02 021), Octora -
#TITLE_ALTERNATIVE#
by: (NIM: 121 02 059), Niko -
#TITLE_ALTERNATIVE#
by: Firmansyah (NIM 124 02 021), Yusi