#TITLE_ALTERNATIVE#

To expand its production, Unit Bisnis Pertambangan Emas (UPBE) Pongkor (PT. XYZ) had planned to develop a mine at Ciguha area at level 400/450. The development of Mining Production at this level will be started by the construction of inclined shaft build down to level 400/450.<p> <br />...

Full description

Saved in:
Bibliographic Details
Main Author: DANTON PANDAPOTAN SILALAHI (NIM 121 02 021); Pembimbing : Prof. Dr. Ir. Rudy Sayoga Gautama , DIMORIS
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/15406
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia