CRITICAL PATH ANALYSIS FOR MULTI-BLOCK COMBINED CYCLE POWER PLANT CONSTRUCTION ON LIMITED WORK AREA USING CPM

Power plant construction becomes such a crucial thing in the era when energy has grown into such an inevitable demand on modern human civilization. Limited natural resources become a major trigger for implementation of high-efficiency power plant. Advances in science and technology have succeeded on...

Full description

Saved in:
Bibliographic Details
Main Author: MART CAHYA (NIM : 13205120); Pembimbing : Dr. Ir. Yusra Sabri, FAZAR
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/15651
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia