CRITICAL PATH ANALYSIS FOR MULTI-BLOCK COMBINED CYCLE POWER PLANT CONSTRUCTION ON LIMITED WORK AREA USING CPM
Power plant construction becomes such a crucial thing in the era when energy has grown into such an inevitable demand on modern human civilization. Limited natural resources become a major trigger for implementation of high-efficiency power plant. Advances in science and technology have succeeded on...
Saved in:
Main Author: | MART CAHYA (NIM : 13205120); Pembimbing : Dr. Ir. Yusra Sabri, FAZAR |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/15651 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Evaluasi penerapan critical path method (CPM) pada kontraktor dalam pelaksanaan pembangunan kilang minyak PT X
by: , RISPANDRIYO, Bambang, et al.
Published: (2009) -
The application of critical path method (CPM) on the production time analysis of Teh Botol Sosro at Pt. Sinar Sosro Ungaran, Semarang
by: Hidayat, M. S., et al.
Published: (2022) -
Evaluasi Jaringan Kerja (Network Planning) Menggunakan Critical Path Method (CPM) untuk Optimalisasi Waktu Produksi pada PT. XYZ
by: Marselia, Widia, et al.
Published: (2021) -
Optimalisasi Penjadwalan Proyek Pembangunan Stasiun Kutablang Dengan Metode Project Evaluation and Review Technique (PERT) dan Critical Path Method (CPM)
by: Akbar, Farhan Jordan, et al.
Published: (2019) -
Professionalism, CPM and Marketing
by: TAN, Chin Tiong
Published: (1994)