SEMI-QUANTITATIVE RISK ASSESSMENT FOR CO2 REMOVAL UNIT ARUN LNG PLANT
Process and oil and gas industry have a very important role in national’s development, and can not be separated with the risk of failure that can cause death and financial loss. In process and oil & gas industries, the event is meant to be the failure of pressure boundaries such as pipe wall,...
Saved in:
Main Author: | ADHI NUGROHO (NIM : 13104134); Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, OKTAFIANTO |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/16776 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SEMI QUANTITATIVE RISK ASSESSMENT AND REMAINING STRENGTH ANALYSIS FOR CORRODED OFFSHORE PIPELINE
by: DEWABRATA (NIM : 23109029); Dosen Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, FADHIL -
INTEGRITY ANALYSIS AND SEMI QUANTITATIVE RISK ASSESSMENT FIBER REINFORCED PLASTICS (FRP) COMPOSITE PIPELINE
by: FRANS SAMUEL SAMOSIR (NIM : 13105116); Pembimbing : Prof. Dr. Ir. IGN. Wiratmaja Puja, -
Pengaruh kepemimpinan diri dan efikasi diri terhadap kepuasan kerja karyawan PT. Arun LNG Lhokseumawe
by: , VERDYANI, Vera, et al.
Published: (2009) -
Quantitative Risk Assessment for Main Equipment in Acid Gas Removal and Dehydration Unit (Case Study: Train I Tangguh LNG Plan)
by: TEJO (NIM 13104017), BASKORO -
QUANTITATIVE RISK ASSESSMENT FOR STORAGE TANK CASE STUDY: CGS 10 DURI, PT CHEVRON PACIFIC INDONESIA
by: (NIM : 13105066); Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, ATIKA