PIPING SYSTEM STRESS ANALYSIS ON GEOTHERMAL STEAM PRODUCTION FACILITY LAHENDONG SCRUBBER AREA UNIT IV
Geothermal is a form of environmental friendly and renewable energy thus making geothermal as a potential source to substitute the use of fossil fuel. In order to utilize geothermal energy to its maximum potential, it is necessary to build new geothermal steam production plants across the nation so...
Saved in:
Main Author: | (NIM : 13103042); Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja , SAPTOMO |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17165 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF PIPING SYSTEM IN CLUSTER 24 LAHENDONG UNIT IV GEOTHERMAL PRODUCTION FACILITY
by: JOVAN VIVALDIZ , BOB -
THERMODYNAMIC STUDY OF BINARY CYCLE LAHENDONG GEOTHERMAL POWER PLANT
by: GOZALY (NIM : 13106109); Pembimbing : Dr. Ir. Ari Darmawan Pasek; Prof. Dr. Ir. T. A. Fauzi S., JOAN -
THERMODYNAMICS STUDY OF FLASH-BINARY CYCLE IN THE LAHENDONG GEOTHERMAL POWER PLANT
by: GUNAWAN (NIM : 13106008); Pembimbing 1 : Dr. Ir. Ari Darmawan Pasek; Pembimbing 2 : Prof. , CHRISTIAN -
DESIGN OF RADIAL INFLOW TURBINE FOR BINARY CYCLE IN LAHENDONG GEOTHERMAL POWER PLANT
by: GOZALY (NIM : 23110030); Tim Pembimbing : Prof. Dr. Ir. Aryadi Suwono; Dr. Ir. Ari D. Pasek; , JOAN -
DIMENSION DETERMINATION AND STRESS ANALYSIS OF PIPING SYSTEM IN WELL PAD 29 DIENG UNIT I GEOTHERMAL PRODUCTION FACILITY
by: BHAKTI ARIFMAN , ANDY