MODEL DEVELOPMENT OF READINEES ASSESSMENT OF LOCAL CONTRACTORS IN ACTIVITY MRT JAKARTA TUNNELING PROJECT
The government has planned the implementation of the Jakarta MRT construction projects in order to overcome the problem of transportation in the city of Jakarta. MRT is an infrastructure of high-tech conditions, be it in the process of construction and operation. One of them is the technology that w...
Saved in:
Main Author: | PRIHATIN (NIM : 25 007 307); Dosen Pembimbing : Ir. Biemo W. Soemardi, Ph.D, YULIA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17687 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY ON CONSTRUCTION PROJECTS INDIRECT COST ESTIMATING PRACTICES BY ON LARGE CONTRACTORS IN JAKARTA AND BANDUNG
by: YUSUF (NIM : 250 08 014); Dosen Pembimbing, Ir. Biemo W. Soemardi, MSE., Ph.D., DIANA -
THE STUDY ON CONSTRUCTION PROJECTS INDIRECT COST COMPONENT COST ESTIMATING PRACTICES IN BY MEDIUM-SIZE CONTRACTORS IN BANDUNG AND JAKARTA
by: RAHADIAN (NIM : 25008011); Pembimbing ; Ir. Biemo W. Soemardi, MSE., Ph. D, DONY -
PROFILE SOFT COMPETENCIES OF FOREMAN CONSTRUCTION PROJECT AND PARTNER ASSESSMENT IN DKI JAKARTA AND CITY OF BANDUNG
by: BUDIMAN (NIM : 250.07.007); Pembimbing ; DR. IR. Biemo W. Soemardi; DR. Indryati Soenaryo, M, ARI -
A study in the safety practices of the contractors involved in the construction of the MRT-III project.
by: Cu, Malvin Christian B., et al.
Published: (1999) -
Assessment of tunelling under existing MRT tunnel in Bangkok subsoil
by: Kullapat Phisitkul
Published: (2012)