IMPLEMENTATION STUDY OF RELIABILITY CENTERED MAINTENANCE ON BELT CONVEYOR 13 AND 14 SURALAYA POWER PLANT UNIT 1-4
PLTU Suralaya Unit 1-4 with a capacity of 4x400 MW is a power plant with major contribution in the Java Madura Bali (JAMALI) electricity system. The reliability operation of the plant is influenced by several factors, one of which is coal distribution system. <br /> <br /> <br />...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17712 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:17712 |
---|---|
spelling |
id-itb.:177122017-09-27T14:53:48ZIMPLEMENTATION STUDY OF RELIABILITY CENTERED MAINTENANCE ON BELT CONVEYOR 13 AND 14 SURALAYA POWER PLANT UNIT 1-4 ABIDIN (NIM : 23108311); Pembimbing:Prof. Dr. Ir. Indra Nurhadi, ZAINAL Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17712 PLTU Suralaya Unit 1-4 with a capacity of 4x400 MW is a power plant with major contribution in the Java Madura Bali (JAMALI) electricity system. The reliability operation of the plant is influenced by several factors, one of which is coal distribution system. <br /> <br /> <br /> Equipment belt conveyor BC 13 and the BC 14 is the "heart" of the coal delivery system to Unit 1-4. Failure on both of these belt conveyor will have an impact on the decrease in electricity production in the power plant. <br /> <br /> <br /> To maintain the reliability of equipment BC 13 and BC 14 is necessary appropriate maintenance strategy. Reliability-based maintenance strategy or reliability centered maintenance (RCM) on both the equipment is expected to be able to maintain their reliability. <br /> <br /> <br /> Determination of the appropriate type of maintenance: run-to-failure, preventive, predictive or proactive maintenance is intended to get the effective and efficient maintenance in terms of time and maintenance costs. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
PLTU Suralaya Unit 1-4 with a capacity of 4x400 MW is a power plant with major contribution in the Java Madura Bali (JAMALI) electricity system. The reliability operation of the plant is influenced by several factors, one of which is coal distribution system. <br />
<br />
<br />
Equipment belt conveyor BC 13 and the BC 14 is the "heart" of the coal delivery system to Unit 1-4. Failure on both of these belt conveyor will have an impact on the decrease in electricity production in the power plant. <br />
<br />
<br />
To maintain the reliability of equipment BC 13 and BC 14 is necessary appropriate maintenance strategy. Reliability-based maintenance strategy or reliability centered maintenance (RCM) on both the equipment is expected to be able to maintain their reliability. <br />
<br />
<br />
Determination of the appropriate type of maintenance: run-to-failure, preventive, predictive or proactive maintenance is intended to get the effective and efficient maintenance in terms of time and maintenance costs. |
format |
Theses |
author |
ABIDIN (NIM : 23108311); Pembimbing:Prof. Dr. Ir. Indra Nurhadi, ZAINAL |
spellingShingle |
ABIDIN (NIM : 23108311); Pembimbing:Prof. Dr. Ir. Indra Nurhadi, ZAINAL IMPLEMENTATION STUDY OF RELIABILITY CENTERED MAINTENANCE ON BELT CONVEYOR 13 AND 14 SURALAYA POWER PLANT UNIT 1-4 |
author_facet |
ABIDIN (NIM : 23108311); Pembimbing:Prof. Dr. Ir. Indra Nurhadi, ZAINAL |
author_sort |
ABIDIN (NIM : 23108311); Pembimbing:Prof. Dr. Ir. Indra Nurhadi, ZAINAL |
title |
IMPLEMENTATION STUDY OF RELIABILITY CENTERED MAINTENANCE ON BELT CONVEYOR 13 AND 14 SURALAYA POWER PLANT UNIT 1-4 |
title_short |
IMPLEMENTATION STUDY OF RELIABILITY CENTERED MAINTENANCE ON BELT CONVEYOR 13 AND 14 SURALAYA POWER PLANT UNIT 1-4 |
title_full |
IMPLEMENTATION STUDY OF RELIABILITY CENTERED MAINTENANCE ON BELT CONVEYOR 13 AND 14 SURALAYA POWER PLANT UNIT 1-4 |
title_fullStr |
IMPLEMENTATION STUDY OF RELIABILITY CENTERED MAINTENANCE ON BELT CONVEYOR 13 AND 14 SURALAYA POWER PLANT UNIT 1-4 |
title_full_unstemmed |
IMPLEMENTATION STUDY OF RELIABILITY CENTERED MAINTENANCE ON BELT CONVEYOR 13 AND 14 SURALAYA POWER PLANT UNIT 1-4 |
title_sort |
implementation study of reliability centered maintenance on belt conveyor 13 and 14 suralaya power plant unit 1-4 |
url |
https://digilib.itb.ac.id/gdl/view/17712 |
_version_ |
1820745666741141504 |