IMPLEMENTATION STUDY OF RELIABILITY CENTERED MAINTENANCE ON BELT CONVEYOR 13 AND 14 SURALAYA POWER PLANT UNIT 1-4

PLTU Suralaya Unit 1-4 with a capacity of 4x400 MW is a power plant with major contribution in the Java Madura Bali (JAMALI) electricity system. The reliability operation of the plant is influenced by several factors, one of which is coal distribution system. <br /> <br /> <br />...

Full description

Saved in:
Bibliographic Details
Main Author: ABIDIN (NIM : 23108311); Pembimbing:Prof. Dr. Ir. Indra Nurhadi, ZAINAL
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17712
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first