IMPLEMENTATION STUDY OF RELIABILITY CENTERED MAINTENANCE ON BELT CONVEYOR 13 AND 14 SURALAYA POWER PLANT UNIT 1-4
PLTU Suralaya Unit 1-4 with a capacity of 4x400 MW is a power plant with major contribution in the Java Madura Bali (JAMALI) electricity system. The reliability operation of the plant is influenced by several factors, one of which is coal distribution system. <br /> <br /> <br />...
Saved in:
Main Author: | ABIDIN (NIM : 23108311); Pembimbing:Prof. Dr. Ir. Indra Nurhadi, ZAINAL |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17712 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DEVELOPMENT OF BELT CONVEYOR, SCREW CONVEYOR, AND BUCKET CONVEYOR CALCULATION PROGRAM
by: SUDIRO (NIM : 13105109); Pembimbing Utama : Prof. Dr. Ir. Indra Nurhadi, BAGUS -
STUDY OF IMPLEMENTATION OF RELIABILITY CENTERED MAINTENANCE (RCM) IN PLTU SURALAYA A STUDY CASE OF PULVERIZER, MPS-89N TYPE, 5-7 UNITS
by: (NIM : NIM : 23108327); Pembimbing : Prof. Dr. Ir. H. Indra Nurhadi, ZULFADHLI -
Report on belt conveyors.
by: Soliven, Regulo V.
Published: (1955) -
PERANCANGAN POSITIONER BELT CONVEYOR
by: , HARRA LIESTA TOSHI SATRIANO, et al.
Published: (2013) -
Robust PID controller design for belt conveyor system
by: Addy Wahyudie
Published: (2006)