A PROPOSED OPERATIONS STRATEGY FOR STEAM & SUPPLY TEAM HEAVY OIL OPERATING UNIT OF PT CHEVRON PACIFIC INDONESIA, SUMATERA OPERATIONS, INDOASIA BUSINESS UNIT
The 3R (Right steam, Right time, and Right place) is the goal of the Duri steamflood operations of Heavy Oil Operating Unit, PT Chevron Pacific Indonesia. Unfortunately the goal has not been achieved as expected. Further assessment reveals that the unbalance between user requirements and the operati...
Saved in:
Main Author: | MARTIN (NIM: 29106379) ; Pembimbing: Dr. Ir. Gatot Yudoko, FERRY |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18484 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SISTEM MANAJEMEN OPERATIONAL EXCELLENCE SEBAGAI SUATU ALAT EVALUASI DAN PENGENDALIAN KINERJA MANAJEMEN CHEVRON INDOASIA BUSINESS UNIT
by: , Desiantien, S. E, et al.
Published: (2011) -
OPERATIONS STRATEGY TO IMPROVE PERFORMANCE AND QUALITY OF MAINTENANCE SUPPORT SERVICES PT CHEVRON PACIFIC INDONESIA
by: (NIM: 291063830; Pembimbing: Dr. Ir. Gatot Yudoko, NURSYIRWAN -
A PATH TO THE FUTURE OF OPPORTUNITIES A RECRUITMRNT CONCEPT FOR CHEVRON INDOASIA BUSINESS UNIT
by: Kusuma Wardhana (NIM 29105095), Ganesya -
ANALYSIS AND PROPOSAL OF OUTSOURCING STRATEGY OF ENGINEERING, CONSTRUCTION AND CONSTRUCTION SUPERVISION SERVICES FOR SURFACE FACILITIES AS PART OF OPERATIONS STRATEGY OF PT CHEVRON PACIFIC INDONESIA
by: SIGIT PRATOPO, ST (NIM: 29106364) ; Pembimbing: Dr. Ir. Gatot Yudoko, IGNATIUS -
DESIGN AND EARLY IMPLEMENTATION OF HR SCORECARD PERFORMANCE MEASUREMENT SYSTEM FOR HR NATIONAL ADMIN & SERVICES JAKARTA CHEVRON INDOASIA BUSINESS UNIT
by: PRATHOMO (NIM : 29107049) ; Pembimbing: Ir. John Welly, MSc. , ANINDITO