PROPOSAL OF DEVELOPMENT ACCELERATION IN DMLZ UNDERGROUND MINE AT PT. FREEPORT INDONESIA
Toward the DMLZ Mine Production commissioning on January 2015, DMLZ Engineering Group needs to accelerate development activities in order to avoid project behind schedule. Actual achievement average on year of 2010 is 284 m-Deq per month while target per months along 2011 is 360 m-Deq per month. Tar...
Saved in:
Main Author: | MEIKO GUNAWAN HUTAURUK (NIM : 29109125); Dosen Pembimbing: Dr. Ir. Mursyid Hasan Basri |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18898 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THE INFLUENCE OF ORGANIZATIONAL CULTURE AND COMPETENCE ON EMPLOYEE PERFORMANCE IN UNDERGROUND DMLZ PT FREEPORT INDONESIA
by: ALDRON BETTAY 29115281, DAVID -
THE INFLUENCE OF ORGANIZATIONAL CULTURE AND COMPETENCE ON EMPLOYEE PERFORMANCE IN UNDERGROUND DMLZ PT FREEPORT INDONESIA
by: ALDRON BETTAY 29115281 , DAVID -
AVAILABILITY IMPROVEMENT OF AXERA 8 DRILL CASE STUDY IN UNDERGROUND MINE PT FREEPORT INDONESIA
by: YUDONO ARINTOKO (NIM : 29109113); Pembimbing: Dr. Ir. Mursyid Hasan Basri, -
WASTE ROCK SUPPLY MANAGEMENT IN UNDERGROUND MINING OPERATION PT FREEPORT INDONESIA
by: ABDULLAH 29115033, ANDRI -
OPTIMISASI THROUGHPUT PADA ALAT GRAVITASI DI PROSES PENGGILINGAN PT. FREEPORT INDONESIA
by: SAHUREKA (NIM : 29109413); Dosen Pembimbing: Dr. Ir. Mursyid Hasan Basri, FRANS