RISK MANAGEMENT ANALYSIS FOR CIATER GEOTHERMAL POWER PLANT PROJECT CASE STUDY PT.XYZ

Demand for electricity is increasing with average 6,8% / year, in other side electricity supply is still low, such condition reflects by electricity ratio that below 60%, this situation creates big opportunity for business in power plant especially in geothermal power plant, which Indonesia has a hu...

Full description

Saved in:
Bibliographic Details
Main Author: ADITYA (NIM : 29107072); Pembimbing: Erman Sumirat, SE.Ak, M.Buss (Finance), YAYANG
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/19703
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia