RISK MANAGEMENT ANALYSIS FOR CIATER GEOTHERMAL POWER PLANT PROJECT CASE STUDY PT.XYZ
Demand for electricity is increasing with average 6,8% / year, in other side electricity supply is still low, such condition reflects by electricity ratio that below 60%, this situation creates big opportunity for business in power plant especially in geothermal power plant, which Indonesia has a hu...
Saved in:
Main Author: | ADITYA (NIM : 29107072); Pembimbing: Erman Sumirat, SE.Ak, M.Buss (Finance), YAYANG |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19703 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PEMETAAN RISIKO KLINIS DAN EVALUASI BUDAYA RISIKO UNTUK PENINGKATAN EFEKTIFITAS PELAKSANAAN PEMANTAUAN DAN PENGENDALIAN RISIKO DI RUMAH SAKIT XYZ
by: FITRI HEDDYANNA (NIM : 2910 8055); Pembimbing : Erman Sumirat, SE.Ak., M.Buss., AIDILA -
BUSINESS SCHEME SELECTION ANALYSIS OF COAL BED METHANE (CBM) AT PT PERTAMINA(PERSERO) (Case Study: CBM Business Management in PT Pertamina Hulu Energi)
by: MUHAMAD (NIM : 29108016); Pembimbing : Erman Sumirat SE.AK.,M.Buss., INDOYANU -
BUSINESS SCHEME SELECTION ANALYSIS OF COAL BED METHANE (CBM) AT PT PERTAMINA(PERSERO) (Case Study : CBM Business Management in PT Pertamina Hulu Energi)
by: MUHAMAD (NIM: 29108016); Pembimbing : Erman Sumirat SE.AK.,M.Buss., INDOYANU -
DETERMINING VALUE AT RISK OF PORTFOLIO INVESTMENT THROUGH MONTE CARLO SIMULATION : A CASE STUDY OF RISK INVESTMENT MANAGEMENT AT
by: PARDOMUAN (NIM: 29110323) Pembimbing : Erman Sumirat, SE.AK, M.Buss., TAROMBO -
APPLICATION VaR ANALYSIS on FERTILIZER FACTORY DEVELOPMENT PROJECT FINANCING (CASE STUDY PT. PUPUK KUJANG)
by: KURNIADI HALIM (NIM : 29108006/X-39); Pembimbing : Erman Sumirat, SE, Ak, M.Buss (Finance), DIDI