RISK MANAGEMENT ANALYSIS FOR CIATER GEOTHERMAL POWER PLANT PROJECT CASE STUDY PT.XYZ
Demand for electricity is increasing with average 6,8% / year, in other side electricity supply is still low, such condition reflects by electricity ratio that below 60%, this situation creates big opportunity for business in power plant especially in geothermal power plant, which Indonesia has a hu...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19703 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!