AVAILABILITY IMPROVEMENT OF AXERA 8 DRILL CASE STUDY IN UNDERGROUND MINE PT FREEPORT INDONESIA
It is predicted that PT Freeport Indonesia will experience the lowest point of its production capacity in year 2016-2017 due to Grasberg Mine depletion. To prevent the prediction, Underground (UG) Mine Expansion Projects are accelerated. There are three main UG mining equipments which are UG Drill,...
Saved in:
Main Author: | YUDONO ARINTOKO (NIM : 29109113); Pembimbing: Dr. Ir. Mursyid Hasan Basri |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19738 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROPOSAL OF DEVELOPMENT ACCELERATION IN DMLZ UNDERGROUND MINE AT PT. FREEPORT INDONESIA
by: MEIKO GUNAWAN HUTAURUK (NIM : 29109125); Dosen Pembimbing: Dr. Ir. Mursyid Hasan Basri, -
AVAILABILITY IMPROVEMENT ON NORTH SOUTH CRUSHING PLANT AT PT FREEPORT INDONESIA
by: HASOLOAN LUBIS (NIM: 29107133); Pembimbing: Dr. Ir. Mursyid Hasan Basri, ROBERT -
WASTE ROCK SUPPLY MANAGEMENT IN UNDERGROUND MINING OPERATION PT FREEPORT INDONESIA
by: ABDULLAH 29115033, ANDRI -
DESIGNING INCENTIVE SYSTEM BY APPLYING INDIVIDUAL SCORECARD TO IMPROVE PRODUCTION QUALITY OF DOZ UNDERGROUND MINE, PT. FREEPORT INDONESIA, PAPUA
by: KURNIAWAN (NIM : 29109135); Pembimbing: Prof. Dr. Ir. Jann Hidajat Tjakraatmadja, MSIE, CAHYA -
THE IMPROVEMENT OF MOBILE EQUIPMENT LICENSE PROCESS TO ENSURE THE AVAILABILITY OF LICENSED OPERATOR IN MINING AREAS OF PT FREEPORT INDONESIA
by: INDASARI 29115307, AISYAH