AVAILABILITY IMPROVEMENT OF AXERA 8 DRILL CASE STUDY IN UNDERGROUND MINE PT FREEPORT INDONESIA

It is predicted that PT Freeport Indonesia will experience the lowest point of its production capacity in year 2016-2017 due to Grasberg Mine depletion. To prevent the prediction, Underground (UG) Mine Expansion Projects are accelerated. There are three main UG mining equipments which are UG Drill,...

Full description

Saved in:
Bibliographic Details
Main Author: YUDONO ARINTOKO (NIM : 29109113); Pembimbing: Dr. Ir. Mursyid Hasan Basri
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/19738
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items