AVAILABILITY IMPROVEMENT OF AXERA 8 DRILL CASE STUDY IN UNDERGROUND MINE PT FREEPORT INDONESIA
It is predicted that PT Freeport Indonesia will experience the lowest point of its production capacity in year 2016-2017 due to Grasberg Mine depletion. To prevent the prediction, Underground (UG) Mine Expansion Projects are accelerated. There are three main UG mining equipments which are UG Drill,...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19738 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!