DECISION ANALYSIS IN DETERMINING MANPOWER RESOURCES TO IMPROVE PERFORMANCE OF THE LOWER WANAGON PROJECT PT FREEPORT INDONESIA

Each mining company has accountability to ensure all affected areas due to mining <br /> <br /> operation are in good condition prior to close and leave the mine. As part of mine closure <br /> <br /> plan of Grasberg open pit mine, Lower Wanagon project is very critical for...

Full description

Saved in:
Bibliographic Details
Main Author: HOTLAN NAPITU 29115272, AGUS
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/20819
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia