DECISION ANALYSIS IN DETERMINING MANPOWER RESOURCES TO IMPROVE PERFORMANCE OF THE LOWER WANAGON PROJECT PT FREEPORT INDONESIA
Each mining company has accountability to ensure all affected areas due to mining <br /> <br /> operation are in good condition prior to close and leave the mine. As part of mine closure <br /> <br /> plan of Grasberg open pit mine, Lower Wanagon project is very critical for...
Saved in:
Main Author: | HOTLAN NAPITU 29115272, AGUS |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20819 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
IMPROVEMENT IN DRILLING PROCESS UTILIZATION TO INCREASE PRODUCTION RATE AT LOWER WANAGON PROJECT PT FREEPORT INDONESIA
by: WIJAYANTO 29115304, ARIEF -
IMPROVEMENT IN DRILLING PROCESS UTILIZATION TO INCREASE PRODUCTION RATE AT LOWER WANAGON PROJECT PT FREEPORT INDONESIA
by: WIJAYANTO 29115304, ARIEF -
IMPROVEMENT ON PT. FREEPORT INDONESIA (PTFI) PERFORMANCE MANAGEMENT SYSTEM
by: KAISIEPO (NIM 29115348), ANTHONIUS -
INTEGRATED PROJECT MANAGEMENT SYSTEM TO IMPROVE PROJECT MANAGEMENT PRACTICE. CASE: INHOUSE BROWNFIELD PROJECT PT FREEPORT INDONESIA CONCENTRATING DIVISION
by: NUGROHO WIDYATMOKO (NIM 29115362), ADI -
Improve Space and Manpower Utilisation
by: LAU, Aldred Wen Yang, et al.
Published: (2015)