INTEGRATED DECISION ANALYSIS PROCESS FOR SELECTING GAS OPTIMIZATION ALTERNATIVES; STUDY CASE OF X AND Y FIELDS, PT CHEVRON PACIFIC INDONESIA
Asset Gas Team is responsible for maintaining and increasing gas production in PT. Chevron Pacific <br /> <br /> Indonesia (CPI) concession area. One of the initiative for increasing production is to utilize idle gas <br /> <br /> opportunities within existing X and Y Oil Fie...
Saved in:
Main Author: | NAZAMZI 29115220 , ARDI |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21202 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PLAN OF GAS COMPRESSION SYSTEM OPTIMIZATION AT BEKASAP GAS PLANT PT. CHEVRON PACIFIC INDONESIA ̉̉ DURI
by: PRIBAWANA (NIM : 29106356) ; Pembimbing: Ir. Rudy Bekti, MM, JOHAR -
Process integration approaches to optimal planning of unconventional gas field development
by: Foo, Dominic C.Y., et al.
Published: (2016) -
WELL OPTIMIZATION ON XA-2 AND XA-S INTEGRATED WITH THE SURFACE AND SUBSURFACE IN THE X GAS FIELD
by: WAHYUDI (NIM : 22209061), AGUS -
INTEGRATED PRODUCTION OPTIMIZATION AT DEPLETED GAS FIELD
by: FAJAR KURNIAWAN (NIM 12204059), IMRON -
EVALUATION ON PLANNING AND CONTROLLING PINANG ̉̉ PAGER GAS TRANSMISSION LINE REPLACEMENT PROJECT IN PT. CHEVRON PACIFIC INDONESIA
by: ZAINUDDIN (NIM : 29106380), AHMAD