THE PLANNING OF CONSTRUCTION METHOD OF PRESTRESSED CONCRETE RAILWAY BRIDGE IN BATU TABAL ̉̉ PADANG PANJANG ̉̉ KAYU TANAM CORRIDOR
On the corridor railway line of Batu Tabal - Padang Panjang – Kayu Tanam, there are 14 (fourteen) railway bridges. Since 1813 until 1925, this bridge was used for coal transportation. However, in 2003, the coal transportation through the bridge was stopped due to the depletion of the coal supply....
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21423 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |