THE PLANNING OF CONSTRUCTION METHOD OF PRESTRESSED CONCRETE RAILWAY BRIDGE IN BATU TABAL ̉̉ PADANG PANJANG ̉̉ KAYU TANAM CORRIDOR
On the corridor railway line of Batu Tabal - Padang Panjang – Kayu Tanam, there are 14 (fourteen) railway bridges. Since 1813 until 1925, this bridge was used for coal transportation. However, in 2003, the coal transportation through the bridge was stopped due to the depletion of the coal supply....
Saved in:
Main Author: | RYNINTA DWI KINANTI RAHAYU, BERNADETE |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21423 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF TECHNICAL AND OPERATIONAL ASPECTS OF RAIL ROAD AS SUPPORT TO PROJECT REVITALIZATION OF RAILWAY BRIDGE AT KAYU TANAM - PADANG PANJANG ̉̉ BATU TABAL CORRIDOR
by: ZIKRA AULIA, AFDAL -
CONSTRUCTION METHOD PLANNING FOR CONSTRUCTION OF RAILWAY BRIDGE IN KAYU TANAM ̉̉ PADANG PANJANG ̉̉ BATU TABAL
by: JOSEFANNY, KARIN -
DESIGN OF THE RAILWAY BRIDGE KAYU TANAM - PADANG PANJANG - BATU TABA
by: KURNIAWAN (NIM : 15013152), DENNY -
IMPACT OF A PRESTRESSED BEAM.
by: Thambiratnam, David P.
Published: (2014) -
Load testing of a prestressed girder
by: Pan, Tso Chien, et al.
Published: (2008)