THE PLANNING OF CONSTRUCTION METHOD OF PRESTRESSED CONCRETE RAILWAY BRIDGE IN BATU TABAL – PADANG PANJANG – KAYU TANAM CORRIDOR

On the corridor railway line of Batu Tabal - Padang Panjang – Kayu Tanam, there are 14 (fourteen) railway bridges. Since 1813 until 1925, this bridge was used for coal transportation. However, in 2003, the coal transportation through the bridge was stopped due to the depletion of the coal supply....

Full description

Saved in:
Bibliographic Details
Main Author: RYNINTA DWI KINANTI RAHAYU, BERNADETE
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/21423
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first