ANALYSIS OF ROADHEADER PERFORMANCE FOR TUNNEL RAILWAY CONSTRUCTION IN PURWOKERTO-KROYA LINE IN NOTOG

The railway tunnel at Notog is one of the double track railway tunnels that belong to the Purwokerto-Kroya line, Central Java. The tunnel will be built along 471 meters by using of a roadheader digging tool. One of the important faktors in the tunnel construction process is the excavation activity w...

Full description

Saved in:
Bibliographic Details
Main Author: WISHNU PRADANA (NIM : 12113086), YOGA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/24784
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first