ANALYSIS OF ROADHEADER PERFORMANCE FOR TUNNEL RAILWAY CONSTRUCTION IN PURWOKERTO-KROYA LINE IN NOTOG
The railway tunnel at Notog is one of the double track railway tunnels that belong to the Purwokerto-Kroya line, Central Java. The tunnel will be built along 471 meters by using of a roadheader digging tool. One of the important faktors in the tunnel construction process is the excavation activity w...
Saved in:
Main Author: | WISHNU PRADANA (NIM : 12113086), YOGA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/24784 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
TUNNEL MONITORING WITH TOTAL STATION ON NOTOG RAILWAY TUNNEL
by: Prima Sudibyo (NIM : 22115009), Surya -
ROADHEADER PERFORMANCE ANALYSIS FOR NANJUNG WATER TUNNEL EXCAVATION
by: Wahyu Hidayat, Dhany -
STABILITY ANALYSIS OF THE NOTOG DOUBLE-TRACK RAILWAY TUNNEL BASED ON DISPLACEMENT MONITORING DATA
by: ELIZABET (NIM : 22117028), FIDELIS -
TUNNEL STABILITY ANALYSIS USING 2D AND 3D FINITE ELEMENT METHOD IN THE NOTOG RAILWAY TUNNEL
by: Hulwani, Zati -
STEEL TRUSS BRIDGE STRUCTURE DESIGN FOR DOUBLE TRACK RAILWAY, JAVANESE SOUTHERN RAILWAY LINE, KROYA, CENTRAL JAVA
by: Nugraha, Widi