STORAGE FACILITY LAYOUT DESIGN OF CONSTRUCTION PROJECT Case Study: EPC Terminal LPG Refrigerated Project
PT X is a construction company and currently evaluating its site storage facility design and site storage facility layout. The existing design process are not consistent among projects due to not-systematic design method and over-dependency on designer experience and expertise. Hence, systematic sit...
Saved in:
Main Author: | LOKANTA NIM 13414039, GIOTAMA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27545 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PERANCANGAN TATA LETAK FASILITAS PENYIMPANAN PROYEK KONSTRUKSI Studi Kasus : Proyek EPC Terminal LPG Refrigerated PT X
by: LOKANTA NIM 13414039, GIOTAMA -
PERANCANGAN PROTOTIPE SISTEM PENDUKUNG KEPUTUSAN RANCANGAN FASILITAS DAN TATA TATA LETAK PROYEK KONSTRUKSI STUDI KASUS: PROYEK EPC TERMINAL LPG REFRIGERATED PT X
by: Muhammad Karaka Kilat, Andi -
IMPROVING THE PERFORMANCE OF CHINESE CONSTRUCTION FIRMS ON EPC PROJECTS IN CHINA
by: XIONG YAXIN
Published: (2012) -
Optimising site layout in construction projects
by: Lai, Tzeh Chuen
Published: (2009) -
THE RISK MANAGEMENT OF INTERNATIONAL EPC PROJECTS: BY THE CASE STUDY-INDONESIA S POWER PLANT PROJECT
by: Siwei, Shen