INTEGRATED COST-SCHEDULE RISK ANALYSIS FOR CISUMDAWU TUNNEL CONSTRUCTION PROJECT IN SESSION II PHASE II
<p align="justify">The high number of construction project delays and cost overrun of construction project costs is a major concern in construction management. Both of these problems are caused by risk factors, where risk is defined as a possible occurrence that will impact the const...
Saved in:
Main Author: | ARDISA - Nim: 25017042, HANS |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27711 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SCHEDULE RISK ANALYSIS OF DESIGN BUILD PROJECTS STUDY CASE : PROJECT APMS PT. ANGKASA PURA II CENGKARENG
by: ARDISA, HANS -
FINANCIAL FEASIBLE ANALYSIS OF CISUMDAWU (CILEUNYI SUMEDANG DAWUAN) TOLL ROADS CONSTRUCTION PROJECT
by: AWANG SUKMA (NIM : 15005019); Dosen Pembimbing : Dr. Harmein Rahman ST. MT., ARANDA -
DESIGN OF CONSTRUCTION IMPLEMENTATION METHODS, SCHEDULING, AND ESTIMATION OF CONSTRUCTION COSTS PROJECT BALIKPAPAN FOOTBALL STADION PROJECT
by: Fadhli Mubarak, Muhammad -
EVALUATION OF NUTRIENT AVAILABILITY STATUS AND SOIL QUALITY INDEX ON SLOPING LAND ABOVE TUNNEL 1 CISUMDAWU FREEWAY, WEST JAVA
by: Herno Saragih, Rikki -
Automation project : management & integration Part II
by: Tiffany Kristy Zhou Lili
Published: (2015)