PERANCANGAN PENJADWALAN PRODUKSI BERDASARKAN KONSEP FLOW SHOP SCHEDULING KAJIAN PADA PT X BANDUNG
PT X is a manufacturing company that produces plastic-based products, such as net and rope. There are 5 colors variances and 4 differing sizes of rope produced. The production process consists of 6 workstations and the overall process in the company uses the flow shop concept, in which the flow of p...
Saved in:
Main Author: | SIGRID DWINUGROHO PRIBADI NIM 13414078, MONICA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29038 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PENGEMBANGAN MODEL PENJADWALAN BATCH SUMBER SERENTAK
UNTUK SYSTEM PRODUKSI FLOW SHOP
by: TEJAASIH, INTEN -
MODEL PENJADWALAN PADA SISTEM PRODUKSI FLOW SHOP DENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN
by: Agus Arlianto, Jerry -
Penjadwalan Batch Ekonomis Untuk Produk N Komponen Pada Sistem Produksi Flow Shop Dengan Peningkatan Kapasitas Produksi
by: Farhan Satria, Trinda -
USULAN PENJADWALAN JOB SHOP PADA PT X MENGGUNAKAN ALGORITMA PRIORITY DISPATCHING RULES DENGAN MENGAKOMODASI PENJADWALAN ULANG
by: Patricia Xu, Monica -
PENGEMBANGAN MODEL MULTIOBJEKTIF UNTUK
PENJADWALAN JOB SHOP DINAMIS
(DEVELOPMENT OF MULTIOBJECTIVE MODEL FOR
DYNAMIC JOB SHOP SCHEDULING)
by: , LINDA WAHYUNI SANTOSO, et al.
Published: (2012)