DEVELOPMENT OF OPTIMIZATION MODEL OF MINE DRAINAGE DRAINHOLE DESIGN CASE STUDY GRASBERG OPEN PIT MINE PT FREEPORT INDONESIA
To solve groundwater problems on slopes, it is necessary to implant drainage, for example by installing a horizontal drainhole. Installation of drainhole with a certain spaced uniform pattern is widely used in the installation of drainhole in fractured rocks on open pits. However, the condition is l...
Saved in:
Main Author: | AGUNG CAHYADI, TEDY |
---|---|
Format: | Dissertations |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/31253 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
HYDROMINE SOLUTION: OPTIMIZATION TOOLS FOR MINE DRAINAGE AND DEWATERING IN OPEN-PIT MINING
by: Rahmadani, Fahrul -
DESIGNING AN APPLICATION FOR DRAINAGE SYSTEM IN OPEN PIT MINING
by: SITA DEWI PRAHASTINI (NIM : 22110318), -
HUMAN RESOURCES PLANNING STRATEGY IN PT FREEPORT INDONESIA RELATED TO GRASBERG SURFACE MINE CLOSURE PLAN ON 2015
by: WAROMI (NIM: 29107349 / 37 PTFI); Pembimbing Akademik : Ir. John Welly,MSc. , RICHARD -
MINE DRAINAGE SYSTEM PLANNING IN ORDER TO REDIRECT NATURAL FLOW IN AN OPEN PIT MINE
by: Tanjaya, Septian -
MINE DRAINAGE FACILITIES PLANNING IN PIT OF COAL MINING PT XYZ
by: Indriani Amir, Lili