Preliminary Design of 150 ton/hour Coal Upgrading Technology Commercial Plant: Drying Unit
Coal Upgrading Technology (CUT) is a method among various low rank coal upgrading methods. The CUT process utilizes multistage fluidized bed superheated steam drying followed by tar coating. The next step of CUT development program is the construction of CUT Commercial Plant (CCP) with raw coal...
Saved in:
Main Author: | HADIYANTO, ARIF |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/37532 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PRELIMINARY DESIGN OF 7 TON/H CONTINUOUS MULTISTAGE FLUIDIZED BED DRYING SYSTEM COAL UPGRADING PILOT PLANT
by: Prawisudha, Pandji -
150-ton coconut oil mill plant
by: Corpus, Rafael R.
Published: (1971) -
UTILIZATION OF COAL GASIFICATION UNIT IN A TEA DRYING PLANT
by: Susandy Sanjaya (NIM 230 04 013), Ari -
EFFECT OF PARTICLE SIZE, DRYING DURATION AND DRYING METHOD IN UPGRADING PROCESS OF LOW RANK COAL USING WASTE OIL
by: Amroe, Fadhillah -
Low Rank Coal Upgrading
by: Perpustakaan UGM, i-lib
Published: (2001)