THERMOECONOMIC STUDY OF POWER GENERATION OPTION FOR NIAS ISLAND
Power plant is one of main infrastructure to increase the quality of life by providing electricity. In the construction, government must provide avaibility of electricity in sufficient amount, good quality and also fair in price. The purpose of power plant feasibility study is to obtain optimum resu...
Saved in:
Main Author: | Hafil N, Muhammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/41940 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY OF SATELLITE DERIVED BATHYMETRY FOR ESTABLISHING BASEPOINT IN DETERMINING THE MARITIME BOUNDARIES (STUDY AREA: COASTAL NIAS)
by: Fatoni Aziz, Ma'ruf -
OPERATIONAL PARAMETER DESIGN OF ADDITIONAL COOLING TOWER TO OPTIMIZE PATUHA GEOTHERMAL POWER PLANT POWER GENERATION
by: Hilman Alfajri, Muhammad -
THE IMPACT OF POST-IOD (INDIAN OCEAN DIPOLE) ON RAINFALL IN INDONESIA INDEPENDENT OF ENSO (EL-NIñO SOUTHERN OSCILLATION)
by: Nazli Nasution, Chairul -
A SYSTEM DESIGN OF A SOLAR AND GEOTHERMAL HYBRID POWER PLANT FOR FLORES ISLAND
by: Yakana Berian, Zagy -
ANALYSIS OF LAND CARRYING CAPACITY FOR SETTLEMENT DEVELOPMENT IN TIDUNG ISLAND, PARI ISLAND, AND UNTUNG JAVA ISLAND
by: Fadhilah Akmaldika, Irsyad