EVALUATION OF SUSTAINABLE PRODUCTION UNDER SINGLE-FLASH AND COMBINED CYCLE POWER PLANT USING NUMERICAL SIMULATION FOR A WATERDOMINATED GEOTHERMAL FIELD
The reserves and characteristic of the geothermal reservoir should be studied in an integrated and comprehensive manner as reservoir capability is one of the key factors. The aims to reduce the risk of geothermal resources during exploitation. Therefore, the research on evaluating reservoir capab...
Saved in:
Main Author: | Ridwan Hamdani, Muhamad |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43865 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THE APPLICATION OF BINARY CYCLE ON DIENG GEOTHERMAL POWER PLANT BY COMBINING SINGLE FLASH SYSTEM AND ORGANIC RANKINE CYCLE
by: Ekalaya Yusuf, Daud -
Exergoeconomic Study of a Combined Flash-Binary Cycle at Dieng Unit 2 Geothermal Power Plant
by: Theophilus, Jason -
Exergoeconomic Study of a Combined Flash-Binary Cycle at Dieng Unit 2 Geothermal Power Plant
by: Theophilus, Jason -
THERMODYNAMICS STUDY OF FLASH-BINARY CYCLE IN THE LAHENDONG GEOTHERMAL POWER PLANT
by: GUNAWAN (NIM : 13106008); Pembimbing 1 : Dr. Ir. Ari Darmawan Pasek; Pembimbing 2 : Prof. , CHRISTIAN -
The Optimization of the small scale geothermal field for Combine or binary cycles in the power plant system
by: Perpustakaan UGM, i-lib
Published: (2001)