ECONOMIC AND FINANCIAL ANALYSIS OF UPPER CISOKAN PUMPED STORAGE HYDROELECTRIC POWER PLANT PROJECT
Upper Cisokan will be the first Pumped Storage Hydroelectric Power Plant in Indonesia. This power plant is a solution from PLN, a state owned electricity company, to provide peak power generation in Java-Bali grid system in a socially and environmentally sustainable way. The Upper Cisokan Pumped Sto...
Saved in:
Main Author: | Hawari, Kahhar |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/46000 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
IMPROVEMENT OF PROJECT MANAGEMENT SYSTEM IN CONSTRUCTION DEVELOPMENT: A CASE STUDY OF THE UPPER CISOKAN HYDRO ELECTRIC POWER PLANT
by: Harianto Sinaga, Chandra -
APLIKASI LAPORAN BASIS GEOTEKNIK PADA UPPER CISOKAN PUMPED
STORAGE POWER PLANT PROJECT, JAWA BARAT
by: Sudarminto, .
Published: (2015) -
DESIGN AND NUMERICAL SIMULATION OF FRANCIS REVERSIBLE PUMP-TURBINE AT UPPER CISOKAN PUMPED STORAGE
by: Zharfan Sambas, Rizqy -
PROPOSED PROJECT MANAGEMENT OFFICE (PMO) IN FULFILLING LENDERâS REQUIREMENTS TO ACHIEVE THE TARGET OF CONSTRUCTION WORK ON HYDROELECTRIC POWER PLANT PROJECT (CASE STUDY: PT PLN (PERSERO) UNIT INDUK PEMBANGUNAN JAWA BAGIAN TENGAH)
by: Alpha Yuri Margareta, Rama -
FINANCIAL FEASIBILITY OF PASIR MANDOGE BIOGAS POWER PLANT (PLTBG) PROJECT
by: Andikarama Hamdani, Dandy