CAPITAL PROJECTS PRIORITIZATION AT ITS LIFE CYCLE (CASE STUDY: PT. DELTA BALIKPAPAN)
PT. Delta is Upstream Oil and Gas Company that conduct exploration, production and operation of Oil and Gas processing facilities in East Kalimantan. PT. Delta is registered as Gross Split Production Sharing Contract (GS PSC) in Indonesia. Each year, there are so many projects executed at PT. Delta...
Saved in:
Main Author: | Eko Saputro, Dimas |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/46283 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Project life cycle risk analysis and capital investment decisions
by: Manalo, Romeo Galang, et al.
Published: (2024) -
IMPLEMENTATION OF PROJECT LIFE CYCLE ON ROUTE SURVEY PROJECT (CASE STUDY: PT. SURVEY ARCHIPELAGO INDONESIA)
by: Putu Indra Gunawan, Sang -
DOES CSR EXPENSE AFFECT INDONESIAN LISTED FIRMSâ CAPITAL STRUCTURE OVER THEIR LIFE-CYCLE?
by: Dimas Witjaksono, Aryo -
Project prioritization method using analytic hierarchy process as a tool: An alternative capital rationing methodology
by: Manalo, Marivic Valenzuela
Published: (2008) -
ORGANIZATION CAPITAL DAN FIRM LIFE CYCLE
by: NOVIANTY RIZKA KHUSNULIYAH, 041511233122
Published: (2018)