PROPOSED STRATEGY FOR THE DEVELOPMENT OF TURBOMACHINERY EQUIPMENT SERVICE BUSINESS IN INDONESIA (CASE STUDY: PT TAKA TURBOMACHINERY INDONESIA)
The Republic of Indonesia is currently committed to objectify electricity supply with the amount of 35.000 Megawatt (MW) and it is predicted to finish in 2029. During the preparation, the government alongside PT Perusahaan Listrik Negara (PLN) and Independent Power Producer (IPP) are planned to...
Saved in:
Main Author: | Annisa Mandasari, Sitti |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/49371 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EMPLOYEE ENGAGEMENT ASSESSMENT IN PT TAKA TURBOMACHINERY INDONESIA USING AON HEWITT MODEL
by: Putri Agustina, Tiara -
EMPLOYEE ENGAGEMENT ASSESSMENT IN PT TAKA TURBOMACHINERY INDONESIA USING AON HEWITT MODEL
by: Putri Agustina, Tiara -
PROPOSED BUSINESS STRATEGY FORMULATION FOR HEAVY EQUIPMENT RENTAL SERVICE (CASE: CV KAHURIPAN)
by: Arif Wicaksono, Muhammad -
PROPOSED BUSINESS STRATEGY FOR AVIATION MRO SERVICE COMPANY IN INDONESIA (PT. XYZ)
by: Taqy Abdillah, Farros -
Development of high resolution schemes for unsteady turbomachinery flow
by: Kwang, Ming Hui.
Published: (2008)