KAJIAN BIAYA DAN KEEKONOMIAN PROYEK PENGEMBANGAN PLTP KAPASITAS 20 MW DAN 55 MW DI INDONESIA

There are a lot of developing and to be developed geothermal development project in Indonesia. The generation of geothermal energy is expected to rise from 1,493 MW to 7,238.5 MW in 2025. Because there will be many project to achieve this target, then there should be a study which provide an estimat...

Full description

Saved in:
Bibliographic Details
Main Author: Nugraha, Fachry
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/54641
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:54641
spelling id-itb.:546412021-04-23T14:34:52ZKAJIAN BIAYA DAN KEEKONOMIAN PROYEK PENGEMBANGAN PLTP KAPASITAS 20 MW DAN 55 MW DI INDONESIA Nugraha, Fachry Pertambangan dan operasi berkaitan Indonesia Final Project cost, price, economical project, geothermal project, power generation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/54641 There are a lot of developing and to be developed geothermal development project in Indonesia. The generation of geothermal energy is expected to rise from 1,493 MW to 7,238.5 MW in 2025. Because there will be many project to achieve this target, then there should be a study which provide an estimation about the cost needed and also economical study about this geothermal development project. This study will provide an overview about the expense component of a geothermal development project along with its price which are calculated to the generation of 20 MW and 55 MW in Indonesia. The result of this literature study then will be used to calculate the economical aspect of the project which is described by the value of Internal Rate of Return (IRR), Net Present Value (NPV), and Pay Out Time (POT) that will give a consideration about the feasibility to continue the project or not. The capital cost needed to develop 20 MW generation of geothermal is 142 million US$ or 7.1 million US$/MW along with operating and maintenance cost of 2.74 million US$/year and the make-up well cost of 22.5 million US$. To achieve IRR=16%, in 2023, the price of electricity that is needed is 16.135 cent US$/kWh. Meanwhile, The capital cost needed to develop 20 MW generation of geothermal is 303.45 million US$ or 5.52 million US$/MW along with operating and maintenance cost of 5.225 million US$/year and the make-up well cost of 82.5 million US$. To achieve IRR = 16%, in 2023, the price of electricity that is needed is 11.789 cent US$/kWh. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Pertambangan dan operasi berkaitan
spellingShingle Pertambangan dan operasi berkaitan
Nugraha, Fachry
KAJIAN BIAYA DAN KEEKONOMIAN PROYEK PENGEMBANGAN PLTP KAPASITAS 20 MW DAN 55 MW DI INDONESIA
description There are a lot of developing and to be developed geothermal development project in Indonesia. The generation of geothermal energy is expected to rise from 1,493 MW to 7,238.5 MW in 2025. Because there will be many project to achieve this target, then there should be a study which provide an estimation about the cost needed and also economical study about this geothermal development project. This study will provide an overview about the expense component of a geothermal development project along with its price which are calculated to the generation of 20 MW and 55 MW in Indonesia. The result of this literature study then will be used to calculate the economical aspect of the project which is described by the value of Internal Rate of Return (IRR), Net Present Value (NPV), and Pay Out Time (POT) that will give a consideration about the feasibility to continue the project or not. The capital cost needed to develop 20 MW generation of geothermal is 142 million US$ or 7.1 million US$/MW along with operating and maintenance cost of 2.74 million US$/year and the make-up well cost of 22.5 million US$. To achieve IRR=16%, in 2023, the price of electricity that is needed is 16.135 cent US$/kWh. Meanwhile, The capital cost needed to develop 20 MW generation of geothermal is 303.45 million US$ or 5.52 million US$/MW along with operating and maintenance cost of 5.225 million US$/year and the make-up well cost of 82.5 million US$. To achieve IRR = 16%, in 2023, the price of electricity that is needed is 11.789 cent US$/kWh.
format Final Project
author Nugraha, Fachry
author_facet Nugraha, Fachry
author_sort Nugraha, Fachry
title KAJIAN BIAYA DAN KEEKONOMIAN PROYEK PENGEMBANGAN PLTP KAPASITAS 20 MW DAN 55 MW DI INDONESIA
title_short KAJIAN BIAYA DAN KEEKONOMIAN PROYEK PENGEMBANGAN PLTP KAPASITAS 20 MW DAN 55 MW DI INDONESIA
title_full KAJIAN BIAYA DAN KEEKONOMIAN PROYEK PENGEMBANGAN PLTP KAPASITAS 20 MW DAN 55 MW DI INDONESIA
title_fullStr KAJIAN BIAYA DAN KEEKONOMIAN PROYEK PENGEMBANGAN PLTP KAPASITAS 20 MW DAN 55 MW DI INDONESIA
title_full_unstemmed KAJIAN BIAYA DAN KEEKONOMIAN PROYEK PENGEMBANGAN PLTP KAPASITAS 20 MW DAN 55 MW DI INDONESIA
title_sort kajian biaya dan keekonomian proyek pengembangan pltp kapasitas 20 mw dan 55 mw di indonesia
url https://digilib.itb.ac.id/gdl/view/54641
_version_ 1822929674436608000