KAJIAN BIAYA DAN KEEKONOMIAN PROYEK PENGEMBANGAN PLTP KAPASITAS 20 MW DAN 55 MW DI INDONESIA

There are a lot of developing and to be developed geothermal development project in Indonesia. The generation of geothermal energy is expected to rise from 1,493 MW to 7,238.5 MW in 2025. Because there will be many project to achieve this target, then there should be a study which provide an estimat...

Full description

Saved in:
Bibliographic Details
Main Author: Nugraha, Fachry
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/54641
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items