KAJIAN BIAYA DAN KEEKONOMIAN PROYEK PENGEMBANGAN PLTP KAPASITAS 20 MW DAN 55 MW DI INDONESIA
There are a lot of developing and to be developed geothermal development project in Indonesia. The generation of geothermal energy is expected to rise from 1,493 MW to 7,238.5 MW in 2025. Because there will be many project to achieve this target, then there should be a study which provide an estimat...
Saved in:
Main Author: | Nugraha, Fachry |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/54641 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALISIS KEEKONOMIAN PENGEMBANGAN LAPANGAN LEPAS PANTAI X DENGAN PEMAKAIAN FASILITAS BERSAMA
by: Setyawan, Rendy -
PERANCANGAN DAN ANALISIS KEEKONOMIAN PEREKAHAN HIDRAULIK SUMUR BT-X
by: Maryono, Dedi -
EVALUASI KELAYAKAN WILAYAH KERJA X SECARA KETEKNIKAN DAN KEEKONOMIAN PASCA BERAKHIR KONTRAK KERJA SAMA
by: Erwil Prasetya, Fadly -
STUDI EFISIENSI DAN KEEKONOMIAN INJEKSI SURFAKTAN DENGAN SUMUR INJEKSI HORIZONTAL PADA RESERVOIR TIPIS BERPOLA LIMA TITIK
by: Nur Indra Prasetyo, Dwi -
ANALISIS KEEKONOMIAN PEMBORAN SUMUR MULTILATERAL PADA RESERVOIR HETEROGEN BERTENAGA DORONG AIR DENGAN ANALISIS MULTIVARIAT
by: Kunto Bisono, Sidik