KAJIAN BIAYA DAN KEEKONOMIAN PROYEK PENGEMBANGAN PLTP KAPASITAS 20 MW DAN 55 MW DI INDONESIA
There are a lot of developing and to be developed geothermal development project in Indonesia. The generation of geothermal energy is expected to rise from 1,493 MW to 7,238.5 MW in 2025. Because there will be many project to achieve this target, then there should be a study which provide an estimat...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/54641 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |