INITIAL KILLING PROCESS IMPROVEMENT FOR PLUG AND ABANDONMENT JOB AT DURI STEAM FLOOD ENVIRONMENT
Beside to produce oil or gas, each production sharing contractor (PSC) including the Maliha Minyak Indonesia (MMI) has obligation to restore ex-location of oil and gas wells and eliminate the environmental impact by performing Plug and Abandonment (P&A).The total P&A Wells executed by MMI...
Saved in:
Main Author: | Putra, Arsallah |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/54667 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROCESS IMPROVEMENT TO REDUCE SUSPENDED WELL DUE TO INITIAL KILLING PROBLEM FOR WORK OVER WELL SERVICE JOB AT DANA STEAM FLOOD AREA
by: Budisantoso, Imam -
STRATEGIC DECISION ANALYSIS TO ACCELERATE PLUG & ABANDONMENT PROJECT AT SUMATRA BLOCK
by: Budi Utomo, Santoso -
IMPROVEMENT ON FISHING JOB PERFORMANCE ON TUBING PUMP STUCK IN HEAVY OIL OPERATION THROUGH LEAN SIX SIGMA METHODOLOGY (A CASE STUDY IN DURI FIELD - PT. CDI)
by: Junaidi, Hendri -
LEAN SIX SIGMA IMPLEMENTATION TO IMPROVE ACID UNLOADING ACTIVITY IN STEAM FLOOD OPERATION FIELD: A CASE STUDY OF WELL SERVICE ACTIVITY - PT. PAS
by: Pratama Purba, Niko -
IMPROVING CONTRACT MONITORING PROCESS AT JOB KASYAIRA
by: Rahmadhina, Rafina