OPTIMIZATION OF HEAVY EQUIPMENT FOR DRILLING SITE LOCATION USING DYNAMIC PROGRAMMING RECURSIVE APPLICATION <BR />

<b>Abstract :</b><p align=\"justify\">PT. VICO Indonesia is a company that operate in petroleum industry. All activities in PT VICO Indonesia, as petroleum company, is aimed to production phase. To reach production phase, there are several phase should be done, they are:...

Full description

Saved in:
Bibliographic Details
Main Author: Indra Permadi (NIM : 25099081), Nugraha
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/5512
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:5512
spelling id-itb.:55122006-06-01T11:03:57ZOPTIMIZATION OF HEAVY EQUIPMENT FOR DRILLING SITE LOCATION USING DYNAMIC PROGRAMMING RECURSIVE APPLICATION <BR /> Indra Permadi (NIM : 25099081), Nugraha Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Theses PT VICO, Petroleum, Process INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/5512 <b>Abstract :</b><p align=\"justify\">PT. VICO Indonesia is a company that operate in petroleum industry. All activities in PT VICO Indonesia, as petroleum company, is aimed to production phase. To reach production phase, there are several phase should be done, they are: drilling site location preparation, drilling, flow line installation and tie in to production line. <br /> <p align=\"justify\"> <br /> The above explanation indicates that drilling site preparation is very important activity Activity in drilling site preparation use heavy equipment as main equipment. Problem emerge when the quantity of the equipment dan available time for planning activity is very limited Objective of this research is to make heavy equipment management model that can be used as decision support system. It is expected that application of the model will help manager to make planning activity for drilling site preparation efficiently and accurately. <br /> <p align=\"justify\"> <br /> Basically, process for developing the model consist of 2 main phase : heavy equipment selection and optimization. Equipment selection depend on site criteria, where each site criteria has specific characteristic that determined the equipment selection. Subsequent phase, that is optimization phase, using dynamic programming application, which output is the best equipment composition to be allocated to a specific area/ site, considering limitation on schedule and budget. <br /> <p align=\"justify\"> <br /> The model will be implemented on software prototype with database technology, so it is expected that the model can be integrated to company automation system. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Indra Permadi (NIM : 25099081), Nugraha
OPTIMIZATION OF HEAVY EQUIPMENT FOR DRILLING SITE LOCATION USING DYNAMIC PROGRAMMING RECURSIVE APPLICATION <BR />
description <b>Abstract :</b><p align=\"justify\">PT. VICO Indonesia is a company that operate in petroleum industry. All activities in PT VICO Indonesia, as petroleum company, is aimed to production phase. To reach production phase, there are several phase should be done, they are: drilling site location preparation, drilling, flow line installation and tie in to production line. <br /> <p align=\"justify\"> <br /> The above explanation indicates that drilling site preparation is very important activity Activity in drilling site preparation use heavy equipment as main equipment. Problem emerge when the quantity of the equipment dan available time for planning activity is very limited Objective of this research is to make heavy equipment management model that can be used as decision support system. It is expected that application of the model will help manager to make planning activity for drilling site preparation efficiently and accurately. <br /> <p align=\"justify\"> <br /> Basically, process for developing the model consist of 2 main phase : heavy equipment selection and optimization. Equipment selection depend on site criteria, where each site criteria has specific characteristic that determined the equipment selection. Subsequent phase, that is optimization phase, using dynamic programming application, which output is the best equipment composition to be allocated to a specific area/ site, considering limitation on schedule and budget. <br /> <p align=\"justify\"> <br /> The model will be implemented on software prototype with database technology, so it is expected that the model can be integrated to company automation system.
format Theses
author Indra Permadi (NIM : 25099081), Nugraha
author_facet Indra Permadi (NIM : 25099081), Nugraha
author_sort Indra Permadi (NIM : 25099081), Nugraha
title OPTIMIZATION OF HEAVY EQUIPMENT FOR DRILLING SITE LOCATION USING DYNAMIC PROGRAMMING RECURSIVE APPLICATION <BR />
title_short OPTIMIZATION OF HEAVY EQUIPMENT FOR DRILLING SITE LOCATION USING DYNAMIC PROGRAMMING RECURSIVE APPLICATION <BR />
title_full OPTIMIZATION OF HEAVY EQUIPMENT FOR DRILLING SITE LOCATION USING DYNAMIC PROGRAMMING RECURSIVE APPLICATION <BR />
title_fullStr OPTIMIZATION OF HEAVY EQUIPMENT FOR DRILLING SITE LOCATION USING DYNAMIC PROGRAMMING RECURSIVE APPLICATION <BR />
title_full_unstemmed OPTIMIZATION OF HEAVY EQUIPMENT FOR DRILLING SITE LOCATION USING DYNAMIC PROGRAMMING RECURSIVE APPLICATION <BR />
title_sort optimization of heavy equipment for drilling site location using dynamic programming recursive application <br />
url https://digilib.itb.ac.id/gdl/view/5512
_version_ 1820663706891059200