OPTIMIZATION OF HEAVY EQUIPMENT FOR DRILLING SITE LOCATION USING DYNAMIC PROGRAMMING RECURSIVE APPLICATION <BR />

<b>Abstract :</b><p align=\"justify\">PT. VICO Indonesia is a company that operate in petroleum industry. All activities in PT VICO Indonesia, as petroleum company, is aimed to production phase. To reach production phase, there are several phase should be done, they are:...

Full description

Saved in:
Bibliographic Details
Main Author: Indra Permadi (NIM : 25099081), Nugraha
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/5512
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia