OPTIMIZATION OF HEAVY EQUIPMENT FOR DRILLING SITE LOCATION USING DYNAMIC PROGRAMMING RECURSIVE APPLICATION <BR />
<b>Abstract :</b><p align=\"justify\">PT. VICO Indonesia is a company that operate in petroleum industry. All activities in PT VICO Indonesia, as petroleum company, is aimed to production phase. To reach production phase, there are several phase should be done, they are:...
Saved in:
Main Author: | Indra Permadi (NIM : 25099081), Nugraha |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/5512 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF THE IMPACT OF HIDROLOGICAL SPACE <BR />FUNCTION CHANGE ON WATER BALANCE <BR />CASE OF CEKUNGAN BANDUNG
by: Widiati (NIM : 25395012), Ati -
PEMODELAN VIRTUAL EQUIPMENT BERBASIS MODEL SOLID PADA PENGEMBANGAN VIRTUAL FACTORY
by: Harun, Suryadiwansa -
THE INFLUENCE OF SOME PHYSICAL CHARACTERISTICS OF COARSE AND FINE AGGREGATE ON THE STABILITY, FLEXIBILITY AND SKID RESISTANCE OF A HOT ROLLED MIX
by: Permadi, Edwardus -
#TITLE_ALTERNATIVE#
by: EGA NUGRAHA, NICO -
TEKUK PADA PELAT KOMPOSIT BERLAPIS DENGAN METODA ELEMEN HINGGA
by: Susatia Nugraha, Hera