ANALISIS PERUBAHAN SUHU PERMUKAAN LAUT AKIBAT OUTFALL PEMBANGKIT LISTRIK TENAGA UAP (PLTU) DENGAN CITRA LANDSAT 8 (STUDI KASUS: PLTU PAITON)
Power plant is one of the ways to fulfill the energy needs of human life. One of power plants that currently growing rapidly is the Steam Power Plant (PLTU). One of the largest steam power plants in Indonesia and even in Southeast Asian is Paiton Steam Power Plants that located in Probolinggo Regenc...
Saved in:
Main Author: | Zulfa Darwista, Rofifatuz |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/55802 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Proses formulasi kebijakan privatisasi pembangunan listrik Indonesia pada tahun 1980-an :: Kasus Listrik Swasta PLTU Paiton I
by: , UTORO, Suryo, et al.
Published: (2006) -
EVALUASI KAJIAN RISIKO PADA PROYEK JASA O & M PLTU (OPERATION AND MAINTENANCE PEMBANGKIT LISTRIK TENAGA UAP) PT.PJB SERVICES
by: KURNIAWAN
Published: (2015) -
Evaluasi Keandalan Pembangkit Listrik Tenaga Uap Di PT. PJB Unit Pembangkitan Paiton
by: Perpustakaan UGM, i-lib
Published: (2010) -
Analisis keandalan sistem pembangkit listrik tenaga uap :: Studi kasus di PT Indonesia Power PLTU Unit 3 Tambak Lorok Semarang
by: , WIRYONO, et al.
Published: (2004) -
GAMBARAN KESESUAIAN INSTALASI HIDRAN DI PT PJB UBJ O & PLTU PAITON
by: WAHYU ABDILAH ANAS, 101101001
Published: (2014)