SQUEEZING PHENOMENON HANDLING ON WATER TUNNEL AT MANIKIN DAM IN KUPANG BY USING FOREPOLING
Squeezing phenomemon handling is needed in overcoming the problem of the squeezing phenomenon that occurs on the water tunnel wall at the Manikin Dam with methods that can be applied, one of which is by forepoling which includes the pre-support method. Forepoling is applied in the form of a mater...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/56997 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:56997 |
---|---|
spelling |
id-itb.:569972021-07-23T11:42:21ZSQUEEZING PHENOMENON HANDLING ON WATER TUNNEL AT MANIKIN DAM IN KUPANG BY USING FOREPOLING Stephen Indonesia Final Project displacement, squeezing, forepoling, water tunnel INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/56997 Squeezing phenomemon handling is needed in overcoming the problem of the squeezing phenomenon that occurs on the water tunnel wall at the Manikin Dam with methods that can be applied, one of which is by forepoling which includes the pre-support method. Forepoling is applied in the form of a material that envelops the tunnel. In this study, forepoling modeling was carried out with two models, namely roof forepoling and modification of the second model, namely roof-sidewall forepoling. In addition, in order to increase the effectiveness of squeezing handling with forepoling, further modifications were made by adding a 0.5 meter thick concrete lining. The results of the analysis show that there is a decrease in the total displacement value in the application of squeezing handling with the forepoling roof method, and the roof-support forepoling method when compared to the initial conditions. In handling with roof forepolling, at E values of 230 MPa, 100 MPa, and 80 MPa, the displacement decreased to 14.8 cm, 28.4 cm and 33.5 cm. Then by handling the roof-sidewall forepoling, with E values of 230 MPa, 100 MPa, and 80 MPa, the displacement decreased to 12.6 cm, 24.6 cm, and 29.1 cm. Then with the addition of a 0.5 meter thick concrete lining, with E values of 230 MPa, 100 MPa, and 80 MPa, the displacement decreased to 10.6 cm, 19 cm, and 24 cm. Therefore, the most effective squeezing handling method is the use of a roofsidewall forepoling model added with the application of concrete lining in an effort to resist the deformation that occurs in the Manikin Dam water tunnel. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Squeezing phenomemon handling is needed in overcoming the problem of the
squeezing phenomenon that occurs on the water tunnel wall at the Manikin Dam with
methods that can be applied, one of which is by forepoling which includes the pre-support
method. Forepoling is applied in the form of a material that envelops the tunnel. In this
study, forepoling modeling was carried out with two models, namely roof forepoling and
modification of the second model, namely roof-sidewall forepoling. In addition, in order
to increase the effectiveness of squeezing handling with forepoling, further modifications
were made by adding a 0.5 meter thick concrete lining.
The results of the analysis show that there is a decrease in the total displacement
value in the application of squeezing handling with the forepoling roof method, and the
roof-support forepoling method when compared to the initial conditions. In handling with
roof forepolling, at E values of 230 MPa, 100 MPa, and 80 MPa, the displacement
decreased to 14.8 cm, 28.4 cm and 33.5 cm. Then by handling the roof-sidewall forepoling,
with E values of 230 MPa, 100 MPa, and 80 MPa, the displacement decreased to 12.6 cm,
24.6 cm, and 29.1 cm. Then with the addition of a 0.5 meter thick concrete lining, with E
values of 230 MPa, 100 MPa, and 80 MPa, the displacement decreased to 10.6 cm, 19 cm,
and 24 cm. Therefore, the most effective squeezing handling method is the use of a roofsidewall
forepoling model added with the application of concrete lining in an effort to
resist the deformation that occurs in the Manikin Dam water tunnel. |
format |
Final Project |
author |
Stephen |
spellingShingle |
Stephen SQUEEZING PHENOMENON HANDLING ON WATER TUNNEL AT MANIKIN DAM IN KUPANG BY USING FOREPOLING |
author_facet |
Stephen |
author_sort |
Stephen |
title |
SQUEEZING PHENOMENON HANDLING ON WATER TUNNEL AT MANIKIN DAM IN KUPANG BY USING FOREPOLING |
title_short |
SQUEEZING PHENOMENON HANDLING ON WATER TUNNEL AT MANIKIN DAM IN KUPANG BY USING FOREPOLING |
title_full |
SQUEEZING PHENOMENON HANDLING ON WATER TUNNEL AT MANIKIN DAM IN KUPANG BY USING FOREPOLING |
title_fullStr |
SQUEEZING PHENOMENON HANDLING ON WATER TUNNEL AT MANIKIN DAM IN KUPANG BY USING FOREPOLING |
title_full_unstemmed |
SQUEEZING PHENOMENON HANDLING ON WATER TUNNEL AT MANIKIN DAM IN KUPANG BY USING FOREPOLING |
title_sort |
squeezing phenomenon handling on water tunnel at manikin dam in kupang by using forepoling |
url |
https://digilib.itb.ac.id/gdl/view/56997 |
_version_ |
1822002515256803328 |