SQUEEZING PHENOMENON HANDLING ON WATER TUNNEL AT MANIKIN DAM IN KUPANG BY USING FOREPOLING
Squeezing phenomemon handling is needed in overcoming the problem of the squeezing phenomenon that occurs on the water tunnel wall at the Manikin Dam with methods that can be applied, one of which is by forepoling which includes the pre-support method. Forepoling is applied in the form of a mater...
Saved in:
Main Author: | Stephen |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/56997 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SQUEEZING PHENOMENON HANDLING ON WATER TUNNEL AT MANIKIN DAM IN KUPANG BY USING GROUTING
by: Three Putra Sitanggang, Sebagus -
ANALYSIS ON THE EFFECTIVENESS OF INITIAL SUPPORT ON SWELLING CLAY â A CASE STUDY OF MANIKIN DAM DIVERSION TUNNEL IN KUPANG
by: Stephen -
Centrifuge modelling of tunnel face reinforcement using forepoling
by: Juneja, A., et al.
Published: (2014) -
Stability and Collapse Mechanisms of Unreinforced and Forepole-Reinforced Tunnel Headings
by: YEO CHONG HUN
Published: (2012) -
Analisi finansial pembangunan Waduk Manikin di kabupaten Kupang tahun 2003
by: , MANU, Erol, et al.
Published: (2003)