REDESIGN PT. INDONESIA POWER UBP KAMOJANG PERFORMANCE MEASUREMENT SYSTEM BASED ON PERFORMANCE PRISM

Abstract : <br /> <br /> <br /> <br /> <br /> Nothing that remains except change itself, this also happened in electric power market in Indonesia. PLN monopolistic era has been replaced by free trade era, at least it was in power generation sector which apply the s...

Full description

Saved in:
Bibliographic Details
Main Author: Syafarianto (NIM 291 04 327), Arief
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/5773
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:5773
spelling id-itb.:57732017-09-27T15:30:37ZREDESIGN PT. INDONESIA POWER UBP KAMOJANG PERFORMANCE MEASUREMENT SYSTEM BASED ON PERFORMANCE PRISM Syafarianto (NIM 291 04 327), Arief Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/5773 Abstract : <br /> <br /> <br /> <br /> <br /> Nothing that remains except change itself, this also happened in electric power market in Indonesia. PLN monopolistic era has been replaced by free trade era, at least it was in power generation sector which apply the single buyer multi seller mechanism. PT. Indonesia Power, as a seller, have to change their business way supporting by a good performance measurement system which can drive to fulfill the stakeholder needs in order to reach the company sustainability. <br /> <br /> <br /> <br /> <br /> Therefore, Performance prism is an integral and comprehensive framework of performance measurement system. The framework will identify each company stakeholder, and also verify their key performance indicator (KPI). Then, the KPI weight is calculate by Analytic Hierarchy Process (AHP) that the result will be allied in assessment pattern using the Objective Matrix (OMAX) model. <br /> <br /> <br /> <br /> <br /> The research have show 67 KPI which is divided in five groups (Main Office, Customer, Employees, Supplier, and Government and Community). Each group has been classified in five performance prism facets that are stakeholder satisfaction, stakeholder contribution, strategy, process and capability. The highest KPI weight (4,9%) is the electric power availability which is formulated in Equivalent Availability Factor (EAF) for the customer stakeholder group, while the lowest KPI weight (0,2%) is spread over six KPI in supplier stakeholder group. In case to get the business unit performance index, the KPI weight is multiply with the level of business unit performance achievements on OMAX model. <br /> <br /> <br /> <br /> <br /> Finally, the performance measurement system above could be applied at PT. Indonesia Power especially at geothermal business units, which is combined with its supporting requirements. As a key point, the core of the performance measurement system is not located at the measurement model but at the action which have taken by business units based on the portrait of their performance measurement system. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Abstract : <br /> <br /> <br /> <br /> <br /> Nothing that remains except change itself, this also happened in electric power market in Indonesia. PLN monopolistic era has been replaced by free trade era, at least it was in power generation sector which apply the single buyer multi seller mechanism. PT. Indonesia Power, as a seller, have to change their business way supporting by a good performance measurement system which can drive to fulfill the stakeholder needs in order to reach the company sustainability. <br /> <br /> <br /> <br /> <br /> Therefore, Performance prism is an integral and comprehensive framework of performance measurement system. The framework will identify each company stakeholder, and also verify their key performance indicator (KPI). Then, the KPI weight is calculate by Analytic Hierarchy Process (AHP) that the result will be allied in assessment pattern using the Objective Matrix (OMAX) model. <br /> <br /> <br /> <br /> <br /> The research have show 67 KPI which is divided in five groups (Main Office, Customer, Employees, Supplier, and Government and Community). Each group has been classified in five performance prism facets that are stakeholder satisfaction, stakeholder contribution, strategy, process and capability. The highest KPI weight (4,9%) is the electric power availability which is formulated in Equivalent Availability Factor (EAF) for the customer stakeholder group, while the lowest KPI weight (0,2%) is spread over six KPI in supplier stakeholder group. In case to get the business unit performance index, the KPI weight is multiply with the level of business unit performance achievements on OMAX model. <br /> <br /> <br /> <br /> <br /> Finally, the performance measurement system above could be applied at PT. Indonesia Power especially at geothermal business units, which is combined with its supporting requirements. As a key point, the core of the performance measurement system is not located at the measurement model but at the action which have taken by business units based on the portrait of their performance measurement system. <br />
format Theses
author Syafarianto (NIM 291 04 327), Arief
spellingShingle Syafarianto (NIM 291 04 327), Arief
REDESIGN PT. INDONESIA POWER UBP KAMOJANG PERFORMANCE MEASUREMENT SYSTEM BASED ON PERFORMANCE PRISM
author_facet Syafarianto (NIM 291 04 327), Arief
author_sort Syafarianto (NIM 291 04 327), Arief
title REDESIGN PT. INDONESIA POWER UBP KAMOJANG PERFORMANCE MEASUREMENT SYSTEM BASED ON PERFORMANCE PRISM
title_short REDESIGN PT. INDONESIA POWER UBP KAMOJANG PERFORMANCE MEASUREMENT SYSTEM BASED ON PERFORMANCE PRISM
title_full REDESIGN PT. INDONESIA POWER UBP KAMOJANG PERFORMANCE MEASUREMENT SYSTEM BASED ON PERFORMANCE PRISM
title_fullStr REDESIGN PT. INDONESIA POWER UBP KAMOJANG PERFORMANCE MEASUREMENT SYSTEM BASED ON PERFORMANCE PRISM
title_full_unstemmed REDESIGN PT. INDONESIA POWER UBP KAMOJANG PERFORMANCE MEASUREMENT SYSTEM BASED ON PERFORMANCE PRISM
title_sort redesign pt. indonesia power ubp kamojang performance measurement system based on performance prism
url https://digilib.itb.ac.id/gdl/view/5773
_version_ 1820663755145478144